Application instructions, erosion control plansheets and commonly required forms for side sewer permit applications are available on this page in Adobe PDF format:
- Side Sewer Permit Application Form
- Online Side Sewer Repair Permit Application - geared to side sewer contractors; permits issued by email, generally within 24 hours (see instructions)
Street Use Permit Required for ROW Use
A street use permit is required for side sewer permits with right-of-way (ROW) use. ROW use includes material laydown and storage, stockpiling, curb and sidewalk crossing of equipment, equipment parking during side sewer installation, and/or excavation in the ROW to make a side sewer repair and/or connection. The street use permit is issued concurrently with the side sewer permit.
All side sewer construction located in the ROW must be completed by a Registered Side Sewer Contractor (RSSC). DPD maintains and updates the list of RSSCs. For private property, the work does not need to be completed by an RSSC.
Commonly Required Side Sewer Legal Forms and Special Conditions Forms for Side Sewer
Printed copies of the forms below may be obtained from the DPD Public Resource Center.