
|
|
P-Patch Community Gardens
Longfellow Creek
Longfellow Creek
Take a stroll down the Longfellow Creek Legacy Trail. The Patch is being built as
a part of the renewal of a Seattle City Park's greenspace along the Legacy Trail
that will follow the creek through West Seattle to the Sound. The Patch includes,
two "back saver" garden beds, and two wheelchair accessible beds.
|
(Map)
From Downtown:
- Get on 99 going south to West Seattle Freeway
- On West Seattle Freeway take exit to Delridge Way SW
- Follow Delridge Way SW to Thistle (about 3 mi)
- Turn right on SW Thistle St; 2 blks down on left is P-Patch
|
|
|
|
|
|
25th SW and SW Thistle (Map)
|
|
|
|
Size: 4000 sq ft
Established: 2003
Number of plots: 20
Average length of waitlist: 5-10
Average wait: 6 months
Ownership of land: Seattle Parks and Recreation
|
|
|
|
Adjacent to Longfellow Creek
|
|
|
|
|
|
|
|
|
|