4th Ave S , south of Diagonal |
Signal installed 2002 |
15th Ave NE and NE 120th St |
Parking restrictions changed to PM
peak hour (not 24hour) restrictions in March 2004; signal now under
construction. |
15th Ave NE north of NE Pacific St |
Signalized Autumn 2002 |
25th Ave NE and NE 45th St |
North pedestrian crossing of 25th
Ave NE/NE 44th St installed Sept 2004; Marked crosswalk removed Sept
2004 |
N 85 St and Palatine Ave N |
Removed April 2002; Signal installed
later 2002 |
N 130th St and Ashworth Ave N |
Removed August 2004 |
Admiral Way SW and 41st Ave SW |
Signal installed March 2004 |
Airport Way S south of S Lander St |
Median island installed May 2005 |
Aurora Ave N and N 140th St |
Removed March 2004; bus stops removed
at same time |
Eastlake Ave E and E Howe St |
Road diet completed autumn 2002 |
Greenlake Way N and N 48th St |
Removed as part of High Hazard project
(widening) Aug 2004 |
S Jackson St and 8th Ave S |
Signal installed 2004 |
Leary Wy NW and 3rd Ave NW |
Removed by Leary Way NW project ;
median island added to the north leg of the intersection at legal
crosswalk; Aug/Sept 2004 |
NW Market St and 28th Ave NW |
Traffic signal installed Oct 2004 |
Sand Point Way NE and Ivanhoe Pl
NE |
Signal installed January 2004 |
Western Ave W and 1st Ave W |
Removed April 2004 |
Corridor Projects |
|
23rd Avenue: This project
looked at marked crosswalks along 23 rd Avenue between E Thomas Street
and S Norman Street in conjunction with a King County Metro Service
and Reliability Project. Many of the existing Metro stops were relocated
to existing traffic signals. |
23rd Ave and E Terrace St |
Bus stops relocated June 2003; Crosswalk
removed August 2003. |
23rd Ave S and S Norman St |
Bus stops relocated June 2003; Crosswalk
removed August 2003. |
23 Ave E and E Thomas St |
Bus stops relocated June 2003; Crosswalk
removed August 2003. |
23rd Ave S and S King St |
Signal installed March 2005 |
Rainier Avenue South
Repaving Project: The repaving of Rainier Avenue South between 2003 and 2004 prompted SDOT to reevaluate marked crosswalks along this corridor. A pedestrian signal was installed at one location, and marked crosswalks were removed at four locations. |
Rainier Ave S and 25th Ave S |
Removed April 2004 |
Rainier Ave S and 39th Av S |
Removed 2003 |
Rainier Ave S and 42nd Av S |
Removed 2003 |
Rainier Ave S and S Dakota St |
Removed April 2004 |
Rainier Ave S and S Spencer St (stairway) |
Removed Oct 2004; fire signal to
the north upgraded to pedestrian signal in Oct 2004 |
Rainier Avenue South
Road Diet: To improve the six marked crosswalks along the very southern
portion of Rainier Avenue South (from 57 th Ave S to the City Limits),
SDOT completed a road diet in 2004. A road diet is the reduction
in the number of motor vehicle travel lanes. In this case, the four
lane roadway was converted to one lane in each direction with bicycle
lanes and a center turn lane. |
Rainier Ave S and S Redwing St ROW |
Road diet implemented
August/September 2004; median island under design
|
Rainier Ave S and S Pilgrim St |
Rainier Ave S and S Norfolk St (stairway) |
Rainier Ave S and S Cooper St (stairway) |
Rainier Ave S and Cornell Ave S |
Rainier Ave S and 72 Ave S (stairway) |
Westlake Avenue North: When Westlake Avenue North was repaved during construction of the
Westlake Trail, SDOT reevaluated the marked crosswalks along this
corridor. We were able to improve two of the seven marked crosswalks
on this corridor (at Aloha Street and at Crockett Street ). The remaining
five marked crosswalks were removed, in some cases in conjunction
with the relocation of Metro bus zones. |
Westlake Ave N and Aloha St |
Relocated to south side of intersection July 2003 |
Westlake Ave N and Crockett St |
Signal installed June 2006 |
Westlake Ave N and 8th Ave N |
Removed July 2003 |
Westlake Ave N and Blaine St |
Removed July 2003 |
Westlake Ave N and Newton St |
Removed July 2003 |
Westlake Ave N and Halladay St |
Removed July 2003 |
Westlake Ave N and Newell St |
Removed July 2003 |